中文

ENGLISH

 

Small ceiling light metal aluminum modern mirror polishing spun metal lighting reflector lampshade

Shenzhen Aluminum Casting Parts led lampshade prototype,OEM car light case plastic auto lampshade rapid prototyping with high quality,Hot selling custom lampshade metal stamping part rapid prototype,China-made high precise lampshade prototype parts,OE

 

brass finish lampshades.pngbrass lampshades.jpg

 

Small ceiling light metal aluminum modern mirror polishing spun metal lighting reflector lampshade

Shenzhen Aluminum Casting Parts led lampshade prototype,OEM car light case plastic auto lampshade vowin.cn' target='_blank'>rapid prototyping with high quality,Hot selling custom lampshade metal stamping part vowin.cn/' target='_blank'>rapid prototype,China-made high precise lampshade prototype parts,OEM Customized Metal Cnc Machining Turned Parts Lamp Cover Lampshade

 

 

- These parts are custom made only, not in stock; We can produce based on your drawings or samples.

 

- We can sign NDA(Non-disclosure Agreement) with you if you need; 

 

- Supplying Capacity: 100,000pcs monthly; Small orders are welcome.

 

Available Material (metals) Available Material (plastic)
Alloy (aluminum, zinc, magnesium, titanium) ABS, PC,ABS, PMMA (acrylic), Delrin,POM
Brass, bronze, beryllium, copper PA (nylon), PP, PE, TPO
Carbon steel, stainless steel, SPCC Fiberglass reinforced plastics, Teflon
Processes Surface treatment (finish)
CNC machining(Milling/Turning), Grinding High polish, brush, sand blast, anodization
Sheet metal stamping, bending, welding, assembly  plating (nickel, chrome),powder coat,
Punching, Deep drawing, Spinning Lacquer painting, , silk screen, pad printing
Equipment Quality control
CNC machining centers (FANUC, MAKINO) CMM (3D coordinate measuring machine), 2.5D projector
CNC turning centers/ Lathes / Grinders Thread gauge, hardness, caliber.    A closed-loop QC system
Punching, Spinning and Hydraulic tensile machines Third party inspection available if required
Lead time & Packing Application
7~15 days for sample, 15~25 days for production Automotive industry / Aerospace/ Telecom equipment
3~5 days via express: DHL, FedEx, UPS, TNT, etc. Medical / Marine / Construction / Lighting system
Standard export carton with pallet. Industrial Equipment & Components, etc.

1665-7_03.jpg

  • Competitive

  • One to One Service

  • Enginner Review

  • Quality

  • Fast Delivery

  • Request Quote Right Now

  • Design

    Prototype

    Low Volume Production

    Mold

    Production

    Contact